Sign in Subscribe

Shutesbury Board of Health Rescinds Septic Tank Order for Lakeside Home on Appeal

Board of Health · Meeting of July 29, 2026

Shutesbury's Board of Health unanimously rescinded a tank-replacement order for a lakeside property under appeal, describing the system instead as marginal. Chair Catherine Hilton led the 5-0 vote at the July 29 meeting, telling members she had grown "uneasy" with the original requirement given the absence of functional failure criteria under Title 5, the state septic code. The property at 80 Lakeview Road has multiple private wells within 50 to 100 feet of its leaching pit, a condition that gave the board pause but did not, members agreed, rise to the level of documented failure.

In place of a tank-replacement order, the board will issue a letter describing the system as marginal and strongly recommending annual well water testing, annual pumping, and tank inspection at the time of each pump-out, with a non-binding suggestion that the owner eventually replace the existing tank. The board also approved two routine septic repair permits, for 205 West Column Road and 9 January Hills Road, both 5-0, and discussed a potential $300 outdoor air quality monitor for the town library, pending a consultation with a local volunteer.

In the full story:

  • Who Was There
  • Organizations And Documents Referenced
  • The complete report — 2,707 words

Source: the Board of Health meeting of July 29, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Shutesbury News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Shutesbury News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe