Shutesbury Board of Health Reissues Stalled Septic Permit With New Water Testing Mandate

SHUTESBURY — April 1, 2026 — Shutesbury Board of Health reissues a lapsed septic permit and adds a mandatory annual water testing condition. The three-member board voted unanimously April 1 to reissue the construction permit for 31 Merrill Drive — originally approved roughly three years ago but never installed after the prior owner ran out of funds — under a 2026 permit number and with the application fee waived. Because the system will sit just 70 feet from the property's well, below the standard 100-foot setback, the board amended its motion to require annual late-summer testing for coliform bacteria and nitrates, a condition the board acknowledged has been ordered in the past but never consistently tracked. Board member Arlene moved the amendment; it passed unanimously. The board agreed to begin a formal address-based compliance list starting with 31 Merrill Drive, with the chair volunteering to add a September calendar reminder to check for submitted test results.

Keep reading with a 14-day free trial

Subscribe to The Shutesbury MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Shutesbury MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Franklin County News · The Sunderland Post · The Warwick Post · The Wendell Post · The Whately Post · The Ashfield Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.